Difference between revisions of "Gothamcityrail.com"
Sugarfiend06 (talk | contribs) |
Sugarfiend06 (talk | contribs) |
||
Line 40: | Line 40: | ||
Gotham On the Move! | Gotham On the Move! | ||
|} | |} | ||
− | ===References | + | |
+ | ===March 13, 2008=== | ||
+ | A new update is added to the '''<nowiki>*Service Alert*</nowiki>''' section: | ||
+ | {| class="quote" | ||
+ | |'''RENOVATION PROJECT UPDATE''' | ||
+ | |||
+ | Gotham City Rail’s multi-million dollar renovation project is dedicated to giving Gotham citizens the highest-quality public transportation system in any major metropolis. Wayne Industries announced recently that due to routine technical issues, the GCR’s rebuild would be delayed by four - six weeks. GCR regrets the delay. | ||
+ | |} | ||
+ | |||
+ | ==References== | ||
The Wayne Central-Narrows line being closed is a reference to ''Batman Begins'', when a train heading from the Narrows to Wayne Tower was destroyed by Batman and Jim Gordon to stop the flow of the Fear Toxin. | The Wayne Central-Narrows line being closed is a reference to ''Batman Begins'', when a train heading from the Narrows to Wayne Tower was destroyed by Batman and Jim Gordon to stop the flow of the Fear Toxin. | ||
− | + | ==City Map== | |
The webpage includes a large Gotham city map. | The webpage includes a large Gotham city map. | ||
* [http://www.sendspace.com/file/tbdyb7 (Sendspace link to high-res PDF file of the Gotham city map after compiling smaller maps at all found ARG websites. 4MB by SilentType.)] | * [http://www.sendspace.com/file/tbdyb7 (Sendspace link to high-res PDF file of the Gotham city map after compiling smaller maps at all found ARG websites. 4MB by SilentType.)] |
Revision as of 19:44, 27 March 2008
The site
Gothamcityrail.com is the website for Gotham's railway system.
GOTHAM ON THE MOVE! ** SERVICE ALERT ** Please note the following service advisories due to the Orange Line reconstruction project: Green Line service is closed between Prosper Street and Murtagh until further notice. Service between Murtagh, Haysville and Haysville South will continue on a holiday timetable during the week, and be closed on weekends for the duration of the reconstruction. Orange Line service is closed between Wayne Central and St. Andrews. The Narrows is closed until further notice. Service between St. Andrews, Dullich and The Docks will continue on a holiday timetable during the week, and be closed on weekends for the duration of the reconstruction. ** NEWS **
|
Contact
The website contains the email address feedback@gothamcityrail.com. Emailing it causes the following reply to be sent:
Service Note: Due to ongoing repair work on the system between Wayne Central Station and The Narrows Station, shuttle service will be running between Wayne Central Station and the Prosper Street Station where customers can use their transfer for service across the Rootsville Bridge.
Customer Service |
March 13, 2008
A new update is added to the *Service Alert* section:
RENOVATION PROJECT UPDATE
Gotham City Rail’s multi-million dollar renovation project is dedicated to giving Gotham citizens the highest-quality public transportation system in any major metropolis. Wayne Industries announced recently that due to routine technical issues, the GCR’s rebuild would be delayed by four - six weeks. GCR regrets the delay. |
References
The Wayne Central-Narrows line being closed is a reference to Batman Begins, when a train heading from the Narrows to Wayne Tower was destroyed by Batman and Jim Gordon to stop the flow of the Fear Toxin.
City Map
The webpage includes a large Gotham city map.
- Below: JPG of the map with overlayed map segments found in Gothamnationalbank.com branch locations